Exterior aluminum
cabinets, all reflective
copy.

The main concourse, all aluminum signage, this one containing a digital date/time piece.
This is the original entry sign for the
airport, routed out of plywood and painted. It was made as a "temporary" sign, intended to last for 6 to 8 months until we could construct a new one. This sign was left in place for 6 years and was repainted once during that period.

There are 8 of these suspended
internally lit signs. All copy is
routed in the aluminum face and backed with translucent acrylic.

There are 10 of these offset directional signs, all 6' by 5' and 4" thick aluminum. The paint is a two part urethane, the logo and lettering are premium reflective film.
The main Terminal lettering is 30" tall and is made of 3/4" thick expanded PVC. The
characters were cut with a router, sanded
and sprayed with an oil based urethane
paint. The copy was then mounted with a
standoff of 1" from the face of the building.

Main entrance sign for the airport
measures 12' by 18' and is 8" thick
aluminum. All copy, including the logo,
is premium reflective film.

Glacier Park International Airport

St. Marie Graphics completed this project in it's entirety, all inside and outside signage for Swank Enterprises including the hand carved 5'x18' Welcome to Montana Mural in the passenger waiting area.